TCL was responsible for land use assessment; socio-economic assessment; development and re-development potential appraisal; site identification, preparation of planning briefs and site concept plans and advising on planning and design guidelines for the terminal station and depot sites; and the planning report preparation and production in respect of an 11 km public Light Transit System from downtown Central District to centres on the south side of Hong Kong Island. The scheme included 3 potential terminal station sites, 9 intermediate station sites, one 4.5 ha. depot site and an assessment of development potential along the route.