Project
Description
The
Study reviews the previous Feasibility
Study and examines alternative
alignments for the route to
achieve a cost-effective preliminary
design. The alignment begins
on Lantau, spans the Ma Wan
Channel on a bridge and proceeds
through tunnel, cuttings and
viaduct to an interchange at
So Kwun Wat and on to the Yuen
Long Highway where it will link
in with a new boundary crossing.
Specific responsibilities are
to investigate and report on
the land use opportunities and
constraints and the impacts
on the long term planning in
the districts concerned. This
information is to be combined
with that of the other disciplines
to refine the route alignment.TCL
is also leading a team on the
landscape and visual aspects
of the assignment. |