Hong Kong
China
Other Locations
 
Route 10 - North Lantau to Yuen Long Highway Investigation and Preliminary Design Assignment, Hong Kong
Project Description

The Study reviews the previous Feasibility Study and examines alternative alignments for the route to achieve a cost-effective preliminary design. The alignment begins on Lantau, spans the Ma Wan Channel on a bridge and proceeds through tunnel, cuttings and viaduct to an interchange at So Kwun Wat and on to the Yuen Long Highway where it will link in with a new boundary crossing. Specific responsibilities are to investigate and report on the land use opportunities and constraints and the impacts on the long term planning in the districts concerned. This information is to be combined with that of the other disciplines to refine the route alignment.TCL is also leading a team on the landscape and visual aspects of the assignment.
Copyright © 2004. Townland. All Rights Reserved