Hong Kong
China
Other Locations 
 
Various Infrastructure Studies, Urban Design / Concept Plans / Comprehensive Master Layout Plans, Philippines
Project Description

Report on Power Outlook and Alternative Power Source Study. TCL coordinated technical inputs and researched policy/ regulatory issues on electricity supply requirements for industrial consumers. TCL compiled the Final Report containing the strategic recommendation. The Study focus covered a technical assessment of existing power usage by the Client’s industrial facility and research on national electricity supply industry privatisation and deregulation with its potential implications for industrial consumers. TCL rationalised the strategic thinking to deal with both key issues by investigating all viable options explaining the aspects, positive and negative, to each option. The preferred strategic recommendation was identified in the Final Report for formal presentation to the Client.
Copyright © 2004. Townland. All Rights Reserved