| Project
Description
The
project comprised design and
construction supervision for
major sanitary sewers and stormwater
drains in an existing highly
developed urban area. Works
were intended to increase capacity,
remove pollution from the stormwater
system due to illegal connections
of foul sewers, prevent stormwater
infiltration to the foul sewers,
and improve overall stormwater
drainage system hydraulic performance
to lessen flooding. The planning
inputs consisted of population
forecasting and development
scenario building to input to
drainage/sewerage system capacity
modelling. |