Territorial
Land Drainage and Flood Control Strategy Study (Phase II).
Preparation of a detailed land use planning database to cover the
principal river basins in the New Territories of Hong Kong. |
|
|
|
|
|
|
|
| |
 |
|
Hong
Kong Island West Refuse Transfer Station.
Provision of planning advice to a consortium bidding to develop and
operate a refuse transfer station in a rock cavern. |
|
|
|
|
|
|
|
| |
 |
|
Islands
District Sewerage Master Plan, Additional Works, Hong Kong.
The Project involved the design of small scale sewerage facilities
within low density suburban developments on the offshore islands in
Hong Kong. |
|
|
|
|
|
|
|
| |
 |
|
North
West Kowloon Sewerage Stage III, Phase II and West Kowloon Stormwater
Drainage Improvement Stage I, Hong Kong.
The project comprised design and construction supervision for major
sanitary. |
|
|
|
|
|
|
|
| |
 |
|
Stormwater
Drainage Master Plan Study for the Northern N.T., Hong Kong.
TCL also advised on the compatibility of the drainage project and
land uses shown on relevant statutory plans (Outline Zoning Plans). |
|
|
|
|
|
|
|
| |
 |
|
Feasibility
Study for Waste-to-Energy Incineration Facilities, Hong Kong.
A Study to investigate the feasibility of the development of a waste-to-energy
incinerator(s) in Hong Kong. |
|
|
|
|
|
|
|
| |
 |
|
Hong
Kong Electric Transmission Route Study.
The Team also comprised other professionals including engineering,
marine traffic and environmental consultants. |
|
|
|
|
|
|
|
| |
 |
|
Preliminary
Phase Consultancy Study on Wider Use of Water-Cooled Air-Conditioning
Systems in Hong Kong.
TCL was responsible for planning inputs to the preliminary stage. |
|
|
|
|
|
|
|
| |
 |
|
Outlying
Islands Sewerage Master Plan Stage 2 Review Study, Hong Kong.
TCL was responsible for reviewing relevant planning studies and development
proposals and undertaking projections of future population, employment,
etc. |
|
|
|
|
|
|
|
| |
 |
|
Review
of Tuen Mun and Tsing Yi Sewerage Master Plans, Hong Kong .
TCL was responsible for reviewing relevant planning documents &
undertaking projections of population, employment & students for
the study area. |
|
|
|
|
|
|
|
| |
 |
|
Beach
Pollution Reduction Study, Hong Kong .
TCL was responsible for undertaking projections of population, employment
and future development in the vicinity of 10 beaches throughout Hong
Kong. |
|
|
|
|
|
|
|
| |
 |
|
Strategic
Sewage Disposal Scheme (SSDS) Stage II Preliminary Project.
TCL were responsible for reviewing relevant planning documents and
undertaking population projections for the Study Area. |
|
|
|
|
|
|
|
| |
 |
|
Restoration
of Pillar Point Valley Landfill & Establishment of Recycling Park.
This Study reviewed the standard set of tender documents for the recommended
Recycling Park to restore the closed Pillar Point Valley. |
|
|
|
|
|
|
|
| |
 |
|
Report
on Power Outlook & Alternative Power Source Study.
The preferred strategic recommendation was identified in the Final
Report for formal presentation to the Client. |
|
|
|
|
|
|
|