Territorial Land Drainage and Flood Control Strategy Study (Phase II).
Preparation of a detailed land use planning database to cover the principal river basins in the New Territories of Hong Kong.
 
   
Hong Kong Island West Refuse Transfer Station.
Provision of planning advice to a consortium bidding to develop and operate a refuse transfer station in a rock cavern.
 
   
Islands District Sewerage Master Plan, Additional Works, Hong Kong.
The Project involved the design of small scale sewerage facilities within low density suburban developments on the offshore islands in Hong Kong.
 
   
North West Kowloon Sewerage Stage III, Phase II and West Kowloon Stormwater Drainage Improvement Stage I, Hong Kong.
The project comprised design and construction supervision for major sanitary.
 
   
Stormwater Drainage Master Plan Study for the Northern N.T., Hong Kong.
TCL also advised on the compatibility of the drainage project and land uses shown on relevant statutory plans (Outline Zoning Plans).
 
   
Feasibility Study for Waste-to-Energy Incineration Facilities, Hong Kong.
A Study to investigate the feasibility of the development of a waste-to-energy incinerator(s) in Hong Kong.
 
   
Hong Kong Electric Transmission Route Study.
The Team also comprised other professionals including engineering, marine traffic and environmental consultants.
 
   
Preliminary Phase Consultancy Study on Wider Use of Water-Cooled Air-Conditioning Systems in Hong Kong.
TCL was responsible for planning inputs to the preliminary stage.
 
   
Outlying Islands Sewerage Master Plan Stage 2 Review Study, Hong Kong.
TCL was responsible for reviewing relevant planning studies and development proposals and undertaking projections of future population, employment, etc.
 
   
Review of Tuen Mun and Tsing Yi Sewerage Master Plans, Hong Kong .
TCL was responsible for reviewing relevant planning documents & undertaking projections of population, employment & students for the study area.
 
   
Beach Pollution Reduction Study, Hong Kong .
TCL was responsible for undertaking projections of population, employment and future development in the vicinity of 10 beaches throughout Hong Kong.
 
   
Strategic Sewage Disposal Scheme (SSDS) Stage II Preliminary Project.
TCL were responsible for reviewing relevant planning documents and undertaking population projections for the Study Area.
 
   
Restoration of Pillar Point Valley Landfill & Establishment of Recycling Park.
This Study reviewed the standard set of tender documents for the recommended Recycling Park to restore the closed Pillar Point Valley.
 
   
Report on Power Outlook & Alternative Power Source Study.
The preferred strategic recommendation was identified in the Final Report for formal presentation to the Client.