Shenzhen
Metro Phase II Pre-Feasibility Study, Guangdong Province.
The extended railway system will have a significant effect on the
dispersion or concentration of population and economic activities. |
|
|
|
|
|
|
|
| |
 |
|
MTR
Tai Kok Tsui Station Development Planning Assessment, Kowloon.
The Study recommended alternative development mixes which would likely
be more acceptable from a land use planning point of view. |
|
|
|
|
|
|
|
| |
 |
|
Trans
Peak Railway Feasibility Study, Hong Kong.
TCL was responsible for land use assessment; socio-economic assessment;
development and re-development potential appraisal, site identification,
etc. |
|
|
|
|
|
|
|
| |
 |
|
Proposed
Railway Link from Three Fathoms Cove to Diamond Hill via Tai Wai
TCL was responsible for coordinating, editing, producing, submitting
and presenting all Technical Reports and an Executive Summary. |
|
|
|
|
|
|
|
| |
 |
|
Railway
Development Study Phase II.
TCL provided all planning advice in respect of assessing the proposed
rail alignments, station locations, above station development proposals. |
|
|
|
|
|
|
|
| |
 |
|
West
Rail Technical Study (Phases I and II), Hong Kong.
In respect of the Depot and Northern Section, the aim was to ensure
that the final location and the layout of the Depot, line and associated
stations. |
|
|
|
|
|
|
|
| |
 |
|
West
Rail - Kam Tin Depot Detailed Design, Hong Kong.
The Project was 1 of the 5 Detailed Design Contracts of the West Rail
which will provide a link from the urban area of Kowloon to Tuen Mun. |
|
|
|
|
|
|
|
| |
 |
|
Sheung
Shui - Lok Ma Chau Spur Line Preliminary Project Feasibility Study.
TCL was responsible for assessment of the planning implications of
the Project and identification of the existing and planned land. |
|
|
|
|
|
|
|
| |
 |
|
KCR
East Rail Extensions - Hung Hom Tsim Sha Tsui Extension, Hong Kong.
Planning appraisal of the opportunities and constraints for property
development at the proposed Tsim Sha Tsui East Station. |
|
|
|
|
|
|
|
| |
 |
|
MTR
East Kowloon Line / North Island Line Feasibility Study, Hong Kong.
TCL was responsible for co-ordinating the inputs from specialist consultants
in respect of proposed property developments along the MTR East Kowloon. |
|
|
|
|
|
|
|
| |
 |
|
Property
Development Study for Long Ping Station, Yuen Long.
A multi-disciplinary study for residential / retail development related
to Long Ping Station. |
|
|
|
|
|
|
|
| |
 |
|
KCR
Property Development Study for Nam Cheong Station, Hong Kong.
TCL is responsible for obtaining Town Planning Board approval for
minor amendments to the Master Layout Plan. |
|
|
|
|
|
|
|
| |
 |
|
Integration
of Public Transport Services with New Railways, Hong Kong.
The proposed new railway routes in the New Territories will have a
significant impact on the existing public transport systems, particularly
buses. |
|
|
|
|
|
|
|
| |
 |
|
KCRC
Light Rail Transit Alterations, Environmental Impact Assessments.
Proposed alterations to the Light Rail System operated by KCRC between
Tuen Mun and Yuen Long. |
|
|
|
|
|
|
|
| |
 |
|
Feasibility
Study on Introducing Trolley Bus System in Hong Kong.
Case studies are to be undertaken in South East Kowloon, Hennessy
Road / Queensway and Aberdeen / Ap Lei Chau.. |
|
|
|
|
|
|
|
| |
 |
|
KCR
Property Development Study Work Package, Kam Sheung Road Station.
The key objective of the Study is to secure planning approval in respect
of the development scheme and Master Layout Plan from the Town Planning
Board. |
|
|
|
|
|
|
|
| |
 |
|
KCR
Shatin to Central Link: Preliminary Project Feasibility Study on the
Hung Hom Mass Transportation Centre, Hong Kong.
The planning and development opportunities of providing property development |
|
|
|
|
|
|
|
| |
 |
|
KCR
Shatin to Central Link: Preliminary Project Study on the Fourth Harbour.
TCL undertook the Planning Study to ascertain the development opportunities
and constraints along the rail route options. |
|
|
|
|
|
|
|
| |
 |
|
Consultancy
Study for Provision of Heliport Facilities, Hong Kong.
TCL were the planning & development consultant on a study to identify
the future demand for domestic & cross boundary helicopter services
& facilities. |
|
|
|
|
|
|
|
| |
 |
|
Beijing
LRT Feasibility Study.
Review of the population and employment forecasts for the new LRT
corridor, assessment of the effects on surrounding development. |
|
|
|
|
|
|
|
| |
 |
|
Tianjin
Metro System, Planning Consultancy Services.
General planning advice in improvement of viability of tenders for
expansion and improvement to an existing underground railway. |
|
|
|
|
|
|
|
| |
 |
|
Property
Development Study for Tuen Mun Central Station, West Rail, N.T., Hong
Kong
TCL’s responsibilities included advice on statutory planning
matters, etc. |
|
|
|
|
|
|
|
| |
 |
|
Property
Development Study for Tin Shui Wai Station, West Rail, N.T., Hong
Kong.
The key objective of the Study was to secure planning approval. |
|
|
|
|
|
|
|
| |
 |
|
MTR
Tseung Kwan O Extension Property Development.
TCL was the Team Leader for this Study, and was responsible for providing
planning inputs and submitting the S16 Planning Application. |
|
|
|
|
|
|
|
| |
 |
|
Property
Redevelopment Project Study for the Tai Po Market KCR Station.
TCL was responsible for all planning inputs to a multi-disciplinary
feasibility study for a major property development at the Tai Po Market
KCR Station. |
|
|
|
|
|
|
|
| |
 |
|
KCR
Property Redevelopment Project Study for the Kowloon Tong Station.
The Station occupies a strategic node within Hong Kong’s “Technology
Corridor” along the Kowloon and Canton Railway.. |
|
|
|
|
|
|
|
| |
 |
|
MTR
Tseung Kwan O Extension Property Development.
TCL was the Team Leader for this Study, and was responsible for providing
planning inputs and submitting the S16 Planning Application. |
|
|
|
|
|
|
|
| |
 |
|
Property
Development Study for Long Ping Station, Yuen Long.
A multi-disciplinary study for residential / retail development related
to Long Ping Station. |
|
|
|
|
|
|
|