Project
Description
K7
is the ‘flagship’
project for the Urban Renewal
Authority as Kwun Tong exhibits
some of the Territory’s
most intractable urban problems
requiring comprehensive intervention.
The purpose of the Study is
to formulate an implementable
Development Scheme Plan (DSP)
for Kwun Tong Town Centre (approx.
5.35 ha) with the integration
of “redevelopment”,
“revitalisation”
and “rehabilitation”
approaches. The multi-disciplinary
team is required to conduct
a building condition survey,
a public opinion survey, a property
market study, a financial analysis
and other technical assessments
prior to the formulation of
three initial development options.
A preferred development option
incorporating comments from
relevant Government Departments
is to be formulated and an implementation
strategy is to be developed
addressing the phasing and land
grant issues. TCL is responsible
for the submission of the DSP
with supporting technical assessments
to the Town Planning Board for
planning approval. The Study
also includes the development
of a Government, Institution
and Community (G/IC) Complex
to the southeast of the Study
Area for the reprovisioning
of affected and provisioning
of new G/IC facilities. TCL
is the Coordinator of the Study
and responsible for all the
land use planning, urban design,
landscape and social impact
inputs. |