| |
 |
|
West
Rail Technical Study (Phases
I and II), Hong Kong.
In respect of the Depot
and Northern Section, the
aim was to ensure that the
final location and the layout
of the Depot, line and associated
stations. |
|
|
|
|
|
|
|
| |
 |
|
West
Rail - Kam Tin Depot Detailed
Design, Hong Kong.
The Project was 1 of the
5 Detailed Design Contracts
of the West Rail which will
provide a link from the
urban area of Kowloon to
Tuen Mun. |
|
|
|
|
|
|
|
| |
 |
|
Sheung
Shui - Lok Ma Chau Spur
Line Preliminary Project
Feasibility Study.
TCL was responsible for
assessment of the planning
implications of the Project
and identification of the
existing and planned land. |
|
|
|
|
|
|
|
| |
 |
|
KCR
East Rail Extensions - Hung
Hom Tsim Sha Tsui Extension,
Hong Kong.
Planning appraisal of the
opportunities and constraints
for property development
at the proposed Tsim Sha
Tsui East Station. |
|
|
|
|
|
|
|
| |
 |
|
MTR
East Kowloon Line / North
Island Line Feasibility
Study, Hong Kong.
TCL was responsible for
co-ordinating the inputs
from specialist consultants
in respect of proposed property
developments along the MTR
East Kowloon. |
|
|
|
|
|
|
|
| |
 |
|
Vetting of Submissions on Landfill Gas Hazards.
TCL was responsible for the preparation of a Practice Note and Guidelines for use by development companies and architects. |
|
|
|
|
|
|
|
| |
 |
|
Property
Development Study for Long
Ping Station, Yuen Long.
A multi-disciplinary study
for residential / retail
development related to Long
Ping Station. |
|
|
|
|
|
|
|
|
|
|
|
|